Registering a decentralised sewage system: what to register and how

Registration of decentralised (private) sewage systems applies to every house in a town or village that is not connected to the mains sewer and whose wastewater goes into a septic tank, a holding tank or a biological wastewater treatment plant (BIO plant). The register is kept by the municipality or its water utility, and you can also send the application electronically. Below you'll find out what has to be registered, what information is needed, what the deadlines are and where to find your municipality's requirements.

Prepared by Septiķis Rīga · Updated 30 October 2026 · Sources: 13

After you submit the form, we contact you within 5 minutes

Get a price

Name, phone and address are required. The rest helps us give a more accurate price.

After you submit the form, we contact you within 5 minutes

Who has to register a system

At national level, this is governed by Cabinet Regulation No. 384 “Regulations Regarding the Management and Registration of Decentralised Sewerage Systems”. It applies to systems within the territories of villages and towns that are not connected to the mains sewer and in which wastewater is collected or treated:

  • in factory-made wastewater treatment plants (BIO plants) that discharge the treated water into the environment and have a capacity of less than 5 m³ a day;
  • in septic tanks (tanks with two or more chambers, from which the settled water overflows into the environment);
  • in holding tanks, in which untreated wastewater and sediment accumulate.

Registering the system is the duty of its owner or possessor. If the property is outside the boundaries of a village or town, the national regulations do not apply to it, but municipal binding regulations set their own scope. In Ropaži Municipality, for example, they apply to the villages and the town. If you're not sure, ask the keeper of the register.

Source: Cabinet Regulation No. 384 (27.06.2017), points 2.3, 3 and 15 (likumi.lv); Ropaži Municipality Binding Regulations No. 45/22, point 3 (likumi.lv). Checked on 30 October 2026.

What to include in a septic tank registration application

Each municipality has its own form, but the information requested is similar. Prepare:

  • the property address and cadastral number, the owner's name and contact details;
  • the number of declared and actual residents, water meter readings or approximate monthly consumption;
  • the type of system (septic tank, holding tank or BIO plant) and its volume or model;
  • the year it was put into service and how the system is managed: how often it is pumped, when it was last serviced;
  • whether you plan to connect to the mains sewer.

Some municipalities also require documents to be attached. In Mārupe Municipality, a BIO plant requires the technical passport, from which it can be established that the plant is installed at the specific address. A septic tank requires the construction diagram of the infiltration system, and a holding tank the construction diagram or other available technical documentation.

Source: Mārupe Municipality Binding Regulations No. 13/2023, point 9 (version of 20.10.2026, likumi.lv); Ķekava Municipality Binding Regulations No. 20/2022, point 31 and Annex 3 (likumi.lv). Checked on 30 October 2026.

How to register: step by step

  1. Find out who keeps the register It may be a municipal institution or a water utility. A list for Riga and the largest municipalities in the Riga region is in the table below.
  2. Prepare the information You'll find the volume in the technical passport or the building design. If you don't know it, it can be determined during pumping, because the pumping contractor sees how many cubic metres have been pumped out.
  3. Fill in the form The form is usually on the website of the municipality or the keeper of the register. National regulations provide that the application can be submitted in person, by post or electronically.
  4. Submit it For an application sent electronically, most municipalities require a secure electronic signature or sending it to an official e-address.
  5. Get confirmation The keeper of the register sends a notice of registration within a month. Mārupe Municipality issues a registration certificate, which also states the minimum emptying frequency.
  6. Report changes If the owner, the type of system, the volume or the number of residents changes, report it within a month at the latest. The owner of a BIO plant submits a copy of the maintenance document to the keeper of the register within a month after each maintenance visit.

Source: Cabinet Regulation No. 384, points 15 and 16 (likumi.lv); Mārupe Municipality Binding Regulations No. 13/2023, points 8, 11 and 12. Checked on 30 October 2026.

Deadlines

National regulations provide that the owner submits the application by the date set by the keeper of the register or within six months after the ownership rights have been registered in the Land Register. Municipal registers had to be set up by 31 December 2021, and by the same date the systems had to meet the requirements of the regulations.

In Riga, systems built by the end of 2021 had to be registered by 31 December 2021, and new ones must be registered within one month of construction or being put into service. In Mārupe Municipality, the system of a new build must be registered before the building is put into service. If you have missed the deadline, register the system as soon as possible. The service is still available now.

If the system had not been put in order by the end of 2021 and there is a mains sewer in the street or road next to the property, the regulations required the property to be connected to it by 31 December 2023. Read more on the page connecting to the mains sewer.

Source: Cabinet Regulation No. 384, points 15.1, 17 and 18 (likumi.lv); Riga City Council Binding Regulations No. 66, point 4 (likumi.lv); Mārupe Municipality Binding Regulations No. 13/2023, point 10. Checked on 30 October 2026.

How the requirements differ in Riga and the Riga region

The basic requirements are the same everywhere, but each municipality decides who keeps the register, how often wastewater must be removed and whether anything has to be submitted every year. The main differences:

Municipality Register kept by What to submit regularly Regulations
Riga Riga Housing and Environment Department Declaration of the volume of wastewater removed in the previous year, by 1 May Riga City Council Binding Regulations No. 66
Mārupe Municipality Development and Construction Department Pumping documents on request Binding Regulations No. 13/2023
Ķekava Municipality The municipality For BIO plants, a maintenance certificate by 1 June Binding Regulations No. 20/2022
Ādaži Municipality Agency “Carnikavas komunālserviss” Pumping documents are kept for at least 2 years and shown on request Binding Regulations No. 3/2025
Olaine Municipality AS “Olaines ūdens un siltums” For BIO plants, a maintenance certificate by 1 April Binding Regulations SN7/2019
Salaspils Municipality SIA “Valgums-S” The previous year's pumping documents by 1 March Binding Regulations No. 5/2018
Jūrmala SIA “Jūrmalas ūdens” For BIO plants, volumes and a maintenance certificate by 1 April Binding Regulations No. 37

Read more about each location on our pages about Riga and the Riga region. Regulations change: the new version of Mārupe Municipality's regulations, for example, came into force on 20 October 2026, so check the current version on likumi.lv or the municipality's website before you submit anything.

Sources: Riga Binding Regulations No. 66 (likumi.lv); Mārupe Binding Regulations No. 13/2023 (likumi.lv); Ķekava Binding Regulations No. 20/2022 (likumi.lv); Ādaži Binding Regulations No. 3/2025 (likumi.lv); Olaine Binding Regulations SN7/2019 (likumi.lv); Salaspils Binding Regulations No. 5/2018 (likumi.lv); Jūrmala Binding Regulations No. 37 (likumi.lv). All checked on 30 October 2026.

The register of decentralised sewage systems in Riga

In Riga, registrations and declarations are accepted by the Riga Housing and Environment Department. The service is free of charge, and the application is processed within 30 working days. You can submit it at a Riga Neighbourhood Residents' Centre, by post, or electronically to the official e-address or by e-mail if the document is signed with an electronic signature. If the department does not ask for anything further within a month, the system can be considered registered.

Every year by 1 May, a declaration of the volume of wastewater removed in the previous year must be submitted in Riga. So keep the documents for every pumping. For what they must contain, read contract with a pumping contractor and pumping certificate.

Source: riga.lv service description (updated 06.10.2026); Riga City Council Binding Regulations No. 66, point 5.6. Checked on 30 October 2026.

Inspections and fines

The Law on Water Management Services allows municipalities to provide for administrative liability in their binding regulations for breaches of these rules. In Riga and Ķekava Municipality, a private individual may be given a warning or a fine of up to 70 fine units, and in Mārupe Municipality up to 100 units. One fine unit is €5, so that is up to €350 and €500 respectively.

A municipal representative has the right to access the system and to ask for documents on pumping or maintenance. An inspection goes smoothly if the system is registered, the pumping documents have been kept and the BIO plant has a maintenance record.

Source: Law on Water Management Services, Section 6, Paragraph Five (likumi.lv); Riga Binding Regulations No. 66, points 5.3 and 30; Ķekava Binding Regulations No. 20/2022, points 33.3 and 37; Mārupe Binding Regulations No. 13/2023, point 41; Law on Administrative Liability, Section 16, Paragraph Two (likumi.lv). Checked on 30 October 2026.

What it costs to put the system in order

In Riga, registration itself is free of charge; in other municipalities, check this on the register keeper's website. Costs arise if the system has to be put in order before registration: the septic tank or holding tank needs pumping, the BIO plant needs maintenance, or the volume and condition of a plant without documents have to be established.

If the system does not meet the requirements (for example, a septic tank has no infiltration system or a holding tank is not watertight), the solution may be building a drain field or converting a septic tank into a BIO plant.

Sources

  1. Cabinet Regulation No. 384: definitions, scope (villages and towns), registration, deadlines, transitional provisions (points 2.3, 3, 15–18); in force, version of 22.11.2019 checked 30 October 2026
  2. Law on Water Management Services, Section 6, Paragraph 4, Clause 5 and Paragraph 5: municipal binding regulations and administrative liability checked 30 October 2026
  3. Riga City Council Binding Regulations No. 66: registration deadlines (point 4), declaration by 1 May (point 5.6), access (point 5.3), fines up to 70 fine units (point 30) checked 30 October 2026
  4. In Riga, registration free of charge, 30 working days, ways to submit, silence-means-consent principle checked 30 October 2026
  5. Mārupe Municipality Binding Regulations No. 13/2023 (version of 20.10.2026): register, documents, certificate, fines up to 100 fine units checked 30 October 2026
  6. Mārupe Municipality Binding Regulations No. 40/2026, amendments (in force from 20.10.2026) checked 30 October 2026
  7. Ķekava Municipality Binding Regulations No. 20/2022: registration (points 31, 32), obligations (point 33), fines (point 37) checked 30 October 2026
  8. Ādaži Municipality Binding Regulations No. 3/2025: keeper of the register (point 13.1), documents kept for 2 years (point 12.5) checked 30 October 2026
  9. Olaine Municipality Binding Regulations SN7/2019: keeper of the register (point 5.1), maintenance certificate by 1 April (point 31.5) checked 30 October 2026
  10. Salaspils Municipality Binding Regulations No. 5/2018: keeper of the register SIA Valgums-S (point 5), documents by 1 March (point 7.7) checked 30 October 2026
  11. Jūrmala Binding Regulations No. 37: keeper of the register (point 4.2.1), BIO plant data by 1 April (point 30.4) checked 30 October 2026
  12. Ropaži Municipality Binding Regulations No. 45/22: scope - villages and the town (point 3) checked 30 October 2026
  13. Law on Administrative Liability, Section 16, Paragraph 2: one fine unit is €5 checked 30 October 2026

Put your system in order before registering

If your septic tank or holding tank needs pumping, or your BIO plant needs maintenance with a document, send a request. Give the location, the type of system and its volume, and we'll reply with a price.

Get a price

We contact you within 5 minutes of your request.

Related prices
Service Price
Septic tank or holding tank pumping up to 4 m³ from €75
Pumping up to 6 m³ from €90
Pumping up to 10 m³ from €110
BIO plant maintenance with a document confirming the maintenance from €160
Travel outside Riga ~€1/km

Frequently asked questions

Does a septic tank at a summer house have to be registered?

Yes, if the summer house is within the territory of a village or town. Cabinet Regulation No. 384 makes no distinction between permanent and seasonal homes. If in doubt, check the scope of your municipality's binding regulations or ask the keeper of the register.

I've bought a house with a septic tank. What do I need to do?

Notify the keeper of the register of the change of owner within a month at the latest. If the system was not registered, submit a registration application. National regulations allow six months for this after the ownership rights have been registered in the Land Register, unless the keeper of the register has set a different deadline.

The BIO plant has no technical passport. What should I do?

National regulations require a BIO plant to have documents confirming its conformity; for plants without documentation, a suitable company had to carry out an inspection by 1 January 2020. In Mārupe Municipality, if there is no original documentation, the minimum emptying frequency is set on the basis of a company's written opinion. We can service the plant and describe its condition in the maintenance document. Give the model in your request, if you know it.

Do I have to sign a contract with a pumping contractor after registration?

National regulations don't require a contract as such, but they do require wastewater to be handed over regularly to a pumping contractor and a document for each pumping to be kept for at least two years. Read more on the page contract with a pumping contractor.

How often will it need pumping?

The minimum is set by the municipality. In Riga and Ķekava Municipality a septic tank must be pumped at least once a year, in Mārupe Municipality twice a year, and for a holding tank the frequency is calculated with a formula based on water consumption and volume. Calculation examples are on the page how often to pump a septic tank.

Send a request

A specialist contacts you within 5 minutes to confirm the job and the price.

Get a price

Name, phone and address are required. The rest helps us give a more accurate price.

After you submit the form, we contact you within 5 minutes

Get a price we contact you within 5 minutes